Photo Reprints

Previous Photo
Photo 8 of 72
Next Photo
Begin slide show
PSNH President Gary Long speaks to reporters after announcing a new route through the north country for the Northern Pass project; Thursday, June 27, 2013. The proposed route for transmission lines bringing hydroelectric power from Quebec to New England will travel through a route to the east of the one originally planned and will have nearly eight miles of buried lines.

ALEXANDER COHN / Monitor staff
Caption: PSNH President Gary Long speaks to reporters after announcing a new route through the north country for the Northern Pass project; Thursday, June 27, 2013. The proposed route for transmission lines bringing hydroelectric power from Quebec to New England will travel through a route to the east of the one originally planned and will have nearly eight miles of buried lines. ALEXANDER COHN / Monitor staff Album ID: 1676461 Photo ID: 47926613
This is a low-resolution representation of a high-resolution photo suitable for print reproduction. If the image displayed above is color - the print will be color. If the image displayed above is black and white - the print will be black and white. This preview does not represent high image quality of the products that can be ordered from this site. Unauthorized reproduction of this image prohibited by law. Watermarks do not appear on the final product.